Showing 1 - 5 of 5 , query time: 0.01s
Cover Image
Format:
Image
Carl Garner reconstructing a mine hoist used for moving ore and supplies in the mine.
Cover Image
Format:
Image
Steve Rich unloading mining timber at the bottom of the main shaft, level 16. The mining timbers were loaded vertically by the surface crew to fit the main cage that transported them down into the mine. A timber truck can be seen in the foreground and a "stern" warning sign is in the background.
Cover Image
Format:
Image
Loading mining timbers on a timber truck at the bottom of the main shaft at the Gilman Mine. Steve Rich is using an air hoist to move the load. Timbers were stored at the surface yard and then moved to the main shaft by fork lift for loading.
Cover Image
Format:
Image
W.C. "Bill" May, at left,from the electrical shop, and O.A. McClain, from the machine shop, discussing the general reconstruction of an incline hoist to be used in the mine. This entire hoist except for the drum and bull wheel is being reconstructed in the shop.
Cover Image
Format:
Image
Loading mining timbers from the surface at the main shaft of the Gilman Mine. The timbers were inverted to fit the cage in the shaft.