Showing 1 - 13 of 13 , query time: 0.01s
Cover Image
Format:
Image
The Belden mill and tram in Eagle Canyon, below Gilman. Railroad tracks at bottom right in photo. Taken after the 1919 landslide.
Cover Image
Format:
Image
Part of the mill area in the Gilman mine, showing separation tanks for lead, copper and zinc.
Cover Image
Format:
Image
Machinery seen through railings.
Cover Image
Format:
Image
An ore car at right, going out to the main pit (Grizzly). Once it arrives at the pit, the rocker wheel on the cart is elevated by the track and dumps the contents of the cart into the pit.
Cover Image
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Cover Image
Format:
Image
Quinton Sagrillo performing maintenance on the new zinc dryer. Sagrillo was a dryer operator for New Jersey Zinc. Sagrillo served in World War I and then lived in Telluride and Denver. He and his wife Rose then managed the State Agricultural Farm Experiment Station at Avon for four years. He accepted employment with New Jersey Zinc, working there for 20 years before retiring in 1959.
Cover Image
Format:
Image
Quinton Sagrillo or Frank Jones or Mike Chockie lubricating part of the zinc dryer at Belden.
Cover Image
Format:
Image
Entrance point of the zinc concentrate into the dryer.
Cover Image
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Cover Image
Format:
Image
New dryer being put in place at Belden. Drying fins are seen in the inside of the dryer.
Cover Image
Format:
Image
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment into the facility.
Cover Image
Format:
Image
Moving a dryer section into place by blocking and chaining. Small sections pf pipe were also used to move the dryer.
Cover Image
Format:
Image
Section of the zinc dryer being fitted into place at Belden. Chains and blocks are used to move the equipment into the building.