Showing
1 - 3
of 3
, query time: 0.05s
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Format:
Image
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment
into the facility.