Showing 21 - 26 of 26 , query time: 0.01s
Cover Image
Format:
Image
Looking through the arch (under construction) of the Red Cliff Bridge downward to the lower bridge leading into Red Cliff. Railroad tracks visible. Snow on the ground. "Each [arch] rib came in six sections weighing from 17 to 22 tons apiece. The rib sections were hauled by truck from the depot, about a quarter of a mile away, to the highway bridge directly under the high line [of the arch]..." --CHD Bridge Engineer King Burghardt, in Historical...
Cover Image
Format:
Image
Lover's Leap rock formation which marks the access to Red Cliff. Hoist on the top of the formation indicates the construction period for the Red Cliff arch bridge on Highway 24 (1938-1939). Railroad tracks in foreground. [Red Cliff Bridge construction photo 2]
Cover Image
Format:
Image
Blasting to create a road to the approach to the new Red Cliff arch bridge. Railroad bridge over the Eagle River visible at right foreground. [Red Cliff Bridge construction photo 5]
Cover Image
Format:
Image
Red Cliff Bridge at entrance to road into Red Cliff; opened to the public August, 1941 [see notes]. The pulley system at the top of Lovers' Leap used during the construction of the bridge is still visible at top left. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
Lover's Leap rock formation as seen from below. Hoist on top of the formation dates it somewhere between 1938 and 1939, just prior to construction of the Red Cliff arch bridge. [Red Cliff Bridge construction photo 3]
Cover Image
Format:
Image
Looking up from the arch girders to the support beams of the roadbed in the Red Cliff Bridge. One man is at a girder at the far right; another is standing on the arch right below the roadbed at left. [Red Cliff Bridge construction photo 10]