Showing 1 - 3 of 3 , query time: 0.01s
Cover Image
Format:
Image
A surface tram used to move ore and equipment is on the left coming into Belden from Gilman at the top. Loading tippel, steam room and the dryer buildings are pictured in the lower right.
Cover Image
Format:
Image
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment into the facility.
Cover Image
Format:
Image
Section of the zinc dryer being fitted into place at Belden. Chains and blocks are used to move the equipment into the building.