Archive Search Results
Showing
1 - 20
of 30
, query time: 0.01s
Format:
Image
Looking down on the Sherwood bridge from the Sherwood quarry drum. Hwy 6 is at the top, the Eagle River is flowing under the Sherwood bridge and I-70 is at the bottom.
At the turn of the century, major routes in the Colorado mountains were steep, rocky grades, little more than wagon tracks. By 1910, cars were becoming more prominent but Colorado roads were in terrible condition. That year, the State Highway Commission established Highway 10 from...
5. McCoy lane
Format:
Image
"The McCoy lane looking west. This 1912 photo [says 1911 on verso of photo] shows the front part of the Hotel on the left, [on the right] the blacksmith shop, the big red barn and the front of the old log barn and beyond it, the bridge across Rock Creek. The big barn, approximately fifty by sixty feet in size, was of frame construction and built by C. H. McCoy in 1902. It had stalls for twenty horses and a loft that held ten tons of loose hay....
Format:
Image
Newspaper article showing the estimated location of what was formerly Kent. Milk Creek drainage is to the left of I-70 [3/4 mile west of the Wolcott exit on I-70; Milk Creek comes into the Eagle River at the bridge]. The 4 pines on the opposite hillside remain.
The Old Watson Road labeled in this photograph refers to George Watson, a cattle rancher.
"The Watsons also bought the old Sherwood [Kent] ranch near Wolcott from John Morris, and owned...
Format:
Image
Perlita Knight [Gauthier] standing at the new Red Cliff bridge on Battle Mountain highway.
The dedication was held at noon on Sunday, August 3, 1941. Governor Ralph L. Carr and other officials attended. The bridge and six miles of new highway built over Battle Mountain cost a total of $636,405. The bridge is 470 ft. long, 209 ft. high; the roadbed is 30 ft. wide and has two 18-inch curbs. It is listed on the Historic Bridge Inventory, Colorado Historical...
15. Horn Ranch
Format:
Image
The camel-back bridge over the Eagle River on U.S. Hwy 6 & 24, approximately 5-6 miles east of Eagle, Colorado.Behind the train, is the Leonard Horn ranch with ranch houses to the left of the tall pine tree at center. Rube Creek flows by the ranch houses. The dirt road at left goes to the ranch.
Format:
Image
Woman walking away from the camera next to parked cars for the Red Cliff Bridge dedication. The guard rail is made from wooden posts with attached cable. The approach to the bridge on U.S. Highway 24 is part of the six miles of new road constructed during the project.
[Red Cliff Bridge construction photo 15]
Format:
Image
Pedestrians gathered on the Red Cliff Bridge, Battle Mountain in the background, for the dedication and grand opening. The dedication was held at noon on Sunday, August 3, 1941. Governor Ralph L. Carr and other officials attended. The bridge and six miles of new highway built over Battle Mountain cost a total of $636,405. The bridge is 470 ft. long, 209 ft. high; the roadbed is 30 ft. wide and has two 18-inch curbs. It is listed on the Historic Bridge...
Format:
Image
Pedestrians gathered on the Red Cliff Bridge for the dedication and grand opening. The dedication was held at noon on Sunday, August 3, 1941. Governor Ralph L. Carr and other officials attended. The bridge and six miles of new highway built over Battle Mountain cost a total of $636,405. The bridge is 470 ft. long, 209 ft. high; the roadbed is 30 ft. wide and has two 18-inch curbs. It is listed on the Historic Bridge Inventory, Colorado Historical...